Process
How we take a project from plot to handover
Five clear stages. At each one you know what happens next, what it costs and who is responsible.
- 01
Site visit & requirement discussion
We visit your plot, understand your requirements and budget, and explain approvals needed (AMC / AUDA / GUDA).
- Plot documents and survey number
- Your requirements — floors, rooms, budget, timeline
- Authority (AMC / AUDA / GUDA) and FSI check
- Soil and site conditions
- 02
Design, 3D views & detailed estimate
Our design team prepares plans, elevations and 3D views. You receive an item-wise estimate with material specifications.
- Concept plan and options
- 3D elevation and views
- Item-wise estimate with brand-wise specifications
- Turnkey and labour-contract options
- 03
Approvals, structural drawings & schedule
Building permission drawings, structural design and a construction schedule with stage-wise payment plan are finalised.
- Agreement and stage-wise payment schedule
- Building permission drawings
- RCC structural design and working drawings
- Construction schedule and material plan
- 04
Construction with dedicated site team
Site engineers and supervisors execute the work; the purchase department keeps material flowing on schedule.
- Site engineer and supervisor assigned
- Slab-by-slab material scheduling by purchase department
- Weekly progress updates
- Stage-wise quality checks and bills
- 05
Quality checks & handover
Stage-wise quality checks, finishing snag list and a clean handover with all documentation for BU permission.
- Finishing snag list
- As-built drawings and documents for BU permission
- Handover walkthrough
- After-handover support
FAQ
Frequently asked questions
Do you help with AMC / AUDA building permission?
Yes. Our drawing department prepares permission drawings and we coordinate with your architect or liaison consultant for building permission and BU (Building Use) permission.
How long does it take to construct a bungalow?
A typical G+1 or G+2 bungalow takes about 10–14 months from foundation to handover, depending on size, finishing and approvals. We share a schedule at the start and track it throughout.
How are payments structured?
Payments are stage-wise — foundation, plinth, each slab, masonry, plaster, flooring, finishing and handover — as laid out in the agreement. There are no hidden charges.
Planning a bungalow, building or facility in Ahmedabad?
Get a free site visit, 3D concept and item-wise estimate from our engineering team.